Lock Seq., Scheduler Job Line
When replicating with the Data Director it is possible to configure in which order the subjobs are
processed. This controls in which order tables are read from the database and also in which order
they are updated on the destination sites. Sometimes it is important to control in which order tables
are locked on the destination site to prevent dead lock situation.
This is configured on the Data Replication tab on the Scheduler Job form. New column "Lock Seq." contains the sequence number of the subjob.
Note this column is not visible by default. The Show Column option must be used to make it visible.